How can I See Project-Wise Resource Utilization?

  1. Navigate to Quick Links > Resource Utilization (Refer Image 1)
  2. Click icon > Project > Select a Project (Refer Image 2)
  3. Check the Estimated Vs. Spent Hour by the Resource (Refer Image 3)

Resource UtilizationProject

                                   (Image1)                                                                                     (Image2) 

Estimated Hours
                                                                                                 (Image 3)    

Note:Resource Utilization shows the Hour Spent by a resource in a project. That means the Estimated Vs. Spent Hour